ABOUT US

Facility

At Laszeray, our facility is more than just a manufacturing space — it’s a strategic advantage. Purpose-built for precision and flexibility, our operations reflect the highest standards in workplace investment, and workforce readiness.

Centrally Located. Globally Connected.

Our headquarters in North Royalton, Ohio, just south of Cleveland offers proximity and logistics advantages few can match. Within a 600-mile radius of more than half the U.S. and Canadian population, Laszeray is ideally positioned to serve national and international customers with speed and efficiency. We benefit from:

  • The nation’s 4th-largest interstate system
  • 13 intermodal terminals, 10 major rail yards
  • Four dedicated air cargo terminals and seven commercial airports
  • Direct access to ports via Cleveland, Toledo, and the Ohio River

Modern, Scalable, and Fully Integrated

Our 62,000 square foot, ISO 9001:2015-certified facility houses every critical function under one roof — from engineering and product development to injection molding, CNC machining, assembly, testing, and warehousing. With a 100% temperature-controlled environment, we maintain process stability and product consistency at every stage.

We also operate a secondary site for high-volume assembly overflow, allowing us to scale production as your needs grow — without delay or compromise.

Smart Equipment Layout & Mold Handling

We operate two high-tonnage overhead cranes, which allow for fast, safe, and efficient mold changes. Unlike traditional molding shops that position presses at a 45-degree angle to maximize density for high-output part runs, Laszeray aligns all of our injection presses on-end. This deliberate orientation optimizes workflow for value-added operations and enables the seamless integration of auxiliary equipment within each molding cell — maximizing efficiency and part functionality within the molding cycle.

Powered by Precision Equipment

Our advanced fleet includes:

  • 19 Wittmann Battenfeld Injection Molding Presses (65–720 tons)
  • 13 Haas Multi-Axis Milling Centers, including 5-axis capability
  • Numerous auxiliary equipment including but not limited to a CMM, product testing & validation, automated assembly, pad printing, staking, spin welding, as well as others

Designed for Efficiency & Comfort

Laszeray’s facility is designed for both high performance and employee well-being. Ample natural light throughout the workspace improves visibility, safety, and overall comfort. Our building layout is engineered to promote efficient work and material flow, minimizing handling time and supporting lean manufacturing practices.

Clean. Safe. Ready to Grow.

Operating 24/5 with fully staffed shifts in processing, quality, and maintenance, Laszeray is engineered for uptime and responsiveness. Our team includes highly trained technicians, engineers, and support staff focused on delivering defect-free, high-precision components on schedule.

Our customers routinely comment on the cleanliness and organization of our space — a reflection of our culture of care, precision, and pride. Since 2008, our headquarters has expanded to meet demand, with further growth planned as we continue serving new industries and evolving customer needs.